When to use this checklist
-
Step 1: Write a spec sheet before you send the RFQ
-
Step 2: Split track lighting quotes into four line items
-
Step 3: Ask for the driver BOM—not just the luminaire BOM
-
Step 4: Price certification separately
-
Step 5: For pendants, price freight and damage separately
-
Step 6: For private-label table lamps, get tooling and MOQ in writing
-
Step 7: Confirm dimming compatibility in writing
-
Step 8: Run a 3-year TCO, not a unit-price comparison
-
Common mistakes to avoid
When to use this checklist
This is for procurement teams at commercial lighting distributors, spec firms, and project buyers who are comparing wholesale quotes for architectural lighting—track, pendant, recessed, and private-label table lamps. I've used a version of this checklist for about six years now to compare quotes from 20+ manufacturers, and it has saved us from at least three expensive mistakes. There are eight steps. Skip any of them and you'll end up comparing apples to oranges—or worse, comparing a $180 pendant against a $90 pendant that needs a $60 driver every three years.
One note before we start: this is not about finding the cheapest quote. It's about finding the quote that won't surprise you in year two.
Step 1: Write a spec sheet before you send the RFQ
Most procurement problems start here. If your RFQ says "pendant light, 3000K, 1200mm," you will get five quotes that range 4x in price and zero of them will be comparable.
In my first year doing this, I made the classic rookie error: I assumed "standard" meant the same thing to every vendor. It doesn't. One manufacturer quoted us a fixture with CRI 80 and a 3-step MacAdam ellipse; another quoted CRI 90 with a 2-step. Same headline price? No—but the gap was 12%, not the 40% I'd assumed. Cost me a $600 redo when the client rejected the first batch on color consistency.
Your spec sheet should lock down, at minimum:
- CCT and CRI (and MacAdam step if color-critical)
- Lumen output and beam angle
- Dimming protocol (0-10V, DALI-2, TRIAC, Casambi—pick one)
- Mounting type and canopy dimensions
- IP rating and finish
- Driver location (integral vs. remote)
Checkpoint: Can a manufacturer who has never spoken to you build this fixture from your spec sheet alone? If not, it's not done.
Step 2: Split track lighting quotes into four line items
Track lighting is where quote structures diverge the most. A track lighting manufacturer might quote you a per-meter track price, a per-head fixture price, a driver cost buried in the fixture, and connectors as a separate line—or they might bundle all four into one number. Bundling is convenient and almost always hides the comparison.
Ask for the quote broken into:
- Track (per meter, including end feeds and connectors)
- Fixture heads (per unit)
- Drivers (per unit or per circuit)
- Mounting hardware and suspension
When we benchmarked iGuzzini's architectural lighting portfolio against two other track lighting manufacturers in Q3 2024, the line-item view was the only way to see that one "cheaper" quote was actually 18% more expensive once we priced the drivers and connectors separately. The headline number was lower. The project number wasn't.
Step 3: Ask for the driver BOM—not just the luminaire BOM
This is the step most procurement teams skip, and it's the one that costs the most later.
The driver is the first component to fail in most LED fixtures. If the quote doesn't name the driver brand and model, you're buying a black box. Ask for the driver BOM in writing, and cross-check it against the manufacturer's published LM-80 data and TM-21 lumen maintenance projections. IES LM-80 covers lumen maintenance testing; TM-21 is the extrapolation method. If a vendor can't produce either, that's a signal.
Dodged a bullet on this in early 2024: we were one signature away from a 400-unit order when I asked for the driver model and found it was a no-name unit with no LM-80 data on file. We switched to a vendor using a documented driver and paid about 9% more per unit. That 9% bought us a published 50,000-hour projection instead of a verbal promise.
Checkpoint: Driver brand, model, LM-80 report date, and TM-21 projection—all four, in writing.
Step 4: Price certification separately
"Compliant" is not a price. UL, ETL, DLC, CE, and ENEC listings each carry different testing and documentation costs, and those costs land somewhere in the quote. Ask which certifications are included, which are optional, and what the incremental cost is for each.
I have mixed feelings about how the industry handles this. On one hand, certification costs are real and someone has to pay them. On the other, I've seen quotes where "DLC listed" added $14 per fixture and quotes where it added $3—for the same category of product. The difference was usually testing volume, not quality. That said, don't assume the $3 version is equivalent until you've seen the listing number.
Never accept "guaranteed compliant for your project" as a line item. It's not verifiable and it's not a substitute for a listing number.
Step 5: For pendants, price freight and damage separately
Pendants break. Large ones break more. This is not a margin issue—it's a packaging and handling issue, and it belongs in the comparison.
Ask three questions before you compare landed cost:
- What packaging grade is included (single-wall carton vs. double-wall with foam inserts)?
- Who carries damage risk in transit—the manufacturer, the freight forwarder, or you?
- What's the replacement lead time if 5% of a shipment arrives damaged?
Seeing our Q1 and Q2 2024 pendant orders side by side—same vendor, different packaging spec—made me realize we were absorbing about $2,800 per quarter in damage claims that a $1.40-per-unit packaging upgrade would have prevented. We made the upgrade. Claims dropped to near zero the next quarter.
Step 6: For private-label table lamps, get tooling and MOQ in writing
Private-label table lamp programs have a different cost structure from catalog buying. The unit price is only half the story—tooling, sampling, and MOQ commitments are the other half, and they're where the real negotiation happens.
Get these on paper before you compare unit prices:
- Tooling cost and who owns the tooling after the program ends
- Sampling fee and how many rounds are included
- MOQ per SKU and per finish
- Lead time for first production run vs. reorders
When I compared two private-label quotes in 2023, one was 30% lower per unit. The tooling was 3x higher and the MOQ was per-finish instead of per-SKU. At our volumes, the "cheaper" quote took 14 months to break even. The higher unit price broke even in month five.
Step 7: Confirm dimming compatibility in writing
Dimming is where spec sheets and reality diverge. A fixture that's "DALI compatible" on the datasheet can still flicker on a specific dimmer, and the fix is usually a driver swap at your cost.
Ask for the specific dimmer models the fixture has been tested against—not the protocol, the models. If the manufacturer can't provide a tested-compatibility list, budget for a sample test before you place the full order. This has been my experience with commercial projects specifically; residential dimming is usually more forgiving.
Step 8: Run a 3-year TCO, not a unit-price comparison
Unit price is the least useful number in a lighting procurement decision. Build a simple spreadsheet with these rows:
- Fixture cost (line-item, from Step 2)
- Driver replacement cost × expected replacements in 3 years
- Certification delta (Step 4)
- Freight and damage allowance (Step 5)
- Tooling amortized over expected volume (Step 6, private label only)
- Labor for replacement (use your own maintenance rate)
We've run this on roughly 180 SKUs over six years (maybe 160, I'd have to pull the exact count from the ERP). The pattern is consistent: the lowest unit price wins the TCO comparison less than half the time. The rest of the time, the driver replacement line flips the result.
This is also where process efficiency pays off. Swapping a vendor and re-running the TCO used to take our team five days—now it's closer to two, because the template and the driver BOM library are already built. That's not a dramatic number, but across 180 SKUs it adds up.
Common mistakes to avoid
- Comparing lump-sum quotes. If you can't see the driver, certification, and freight lines, you're not comparing quotes—you're comparing headlines.
- Treating "compliant" as a certification. Ask for the listing number or move on.
- Forgetting replacement labor. A $40 driver swap that takes 45 minutes of maintenance time is not a $40 event.
- Assuming MOQ is negotiable after the PO. It isn't. Get it in the quote.
- Skipping the dimmer test. A $200 sample test is cheaper than a $4,000 driver swap on a finished install.
None of these steps is exotic. The reason they work is that they force the quote to expose its structure before you commit—which is, in my opinion, the single highest-leverage thing a procurement team can do in architectural lighting.