ViparSpectra builds horticultural luminaires that stay readable on a spec sheet: measured PPFD, controllable spectrum, reliable drivers, and sensible upgrade paths across XS1500 Pro, P-Series, and KS-Series families.
Representative spec; full PPFD maps and IES files shared during project review.
Real spec-sheet data, drawn from XS1500 Pro, P1000, P2000, P600, XS2000, and KS5000 horticultural units.
Each family targets a specific grow-room footprint and power budget. Specifiers should select by canopy area and target PPFD, not by headline wattage alone.
150 W passive-cooled bars with 660 nm and IR supplementation. Ideal for 2′ × 2′ canopies and propagation benches.
Tight-footprint panels in 100 W, 100 W, and 200 W variants. A practical upgrade route for growers moving from HPS to LED.
500 W commercial bar arrays designed for 4′ × 4′ to 5′ × 5′ canopies and multi-tier vertical programs.
Hybrid daylight-plus-LED programs that extend photoperiod without changing the heat signature of the house.
Sealed-room canopies where spectrum recipe, heat load, and driver heat-sink strategy matter as much as raw efficacy.
Shallow-profile fixtures that keep the tier-to-canopy gap tight and tray rotations readable for the grow team.
Lower-intensity full-spectrum fixtures that protect clones, seedlings, and mother plants from early-stage stress.
Tight spectrum control and repeatable PPFD for cultivar trials, phenotype work, and breeding programs.
Repeatable deployment across rooms so the operations team sees the same wiring, dimming, and service story in every space.
XS1500 Pro arrays replaced aging HPS on 2′ × 2′ benches. Operator reported tighter internodal spacing and a measurable drop in HVAC sensible load across the room.
P1000 panels supplemented natural daylight in a propagation annex. Spectrum tuning protected young clones from early-stage stretch while keeping operational cost readable.
Tell us the grow area, target PPFD, power envelope, and rollout pressure. We will come back with a ViparSpectra configuration that reads cleanly on the submittal and the facility floor.